Installation Method

Installation Method

PROCESSING ZAPP STAR ALUMINIUM COMPOSITE PANEL

Various fabrication techniques can be employed to fabricate Zapp Star Aluminium Composite Panels. It is recommended to carry out fabrication in a workshop to minimize defects, exercise overall quality control and to attain higher levels of accuracy.
The material can be fabricated by employing the right tools. The blade configuration and the cutting conditions should carefully selected to ensure that frictional forces are minimized and the heat produced during the process is also kept to the minimum.

Cutting

Cutting, electronicsaw, band saw, discscissor.

Slotting

After machining by electronic milling machine or portable milling machine, panel bendable to all inds of polyhedron by hand

Chamfering

Fold into a cartonafter machining ofpunch machine andchamfer

Welding

By plastic rod and thermo-welding machine.

Angle

All angles availableafter slotting

Bending

Curve surface by 3-point style, 3-rollerpanel bender

Riveting

By rivet, bolt, self-fasten screw etc.

Bolting

INSTALLATION PRE-REQUISITES

  • Panels ought to be erected in accordance, with an approved set of shop drawings. In addition structural strength of anchorage and assorted hardware used for fastening should be as per standard and preferably in aluminium as per engineering recommendations.
  • Wherever aluminium comes in contact with dissimilar metals, it should be properly insulated else use of caulking tape is advised to avoid electrolytic corrosion.
  • The bend portions between panel joints shall not be caulked before protective film is removed. Ensure weep holes and drainage channels are unobstructed and free of debris, dirt and sealant.
  • It is recommended to install the panel vertically.

CLEANING METHODS

  • Routine cleaning of the ACP surface is recommended. It may be washed with water and mild detergent, followed by clean water rinse. The frequency with which cleaning is to be carried out and the choice of a suitable cleaning agent depends largely on the location of the building and levels of contamination.
  • Do not clean when surface temperatures are above 40 degree centigrade to avoid formation of stain.
  • The cleaning operation must be carried out from top to bottom followed by proper rinsing with clean water to ensure the removal of the cleansing agent residues. A final wipe down by means of a sponge, leather or wiper is necessary to avoid water stains.

SUGGESTIONS

  • To ensure colour consistency, the total requirement for a project is advised to be placed in one order. It is also recommended to install the panels in the same direction as marked arrow on protective peel-of-film to avoid possible reflection difference.
  • Custom colours are also available upon request for solid colours, metalic colours & special finishes such as mirror, brush finishes act. Subject to the respective minimum quantity.
  • Colour may vary from batch to batch. (± 5)